Concrete contractor · Hillsborough County
Concrete Contractor in Hopewell, Plant City
Driveways, shop slabs, feed pads and patios on Hopewell's grove and old mine ground along State Road 39.
Straight Answers,
Written Quotes
Quick answer
Parts of Hopewell, south of Plant City along State Road 39, were phosphate mined into the 1940s, so a concrete contractor pouring here digs test spots before setting forms. Driveways run $8 to $14 per sq ft, slabs $7 to $12 per sq ft, and base repair gets its own line on the free written estimate.
Hopewell at a glance
Hopewell is the old Callsville crossroads on State Road 39 just south of State Road 60, south of Plant City, among orange groves, abandoned phosphate mines and the 1870 Hopewell Baptist Church.
Grove ground that may hold buried roots, and mined or filled land in places. Test holes come before forms.
Permit office: FDOT for SR 39 and SR 60 connections; Hillsborough County for county roads · official site Read the Tax District on the Property Appraiser record first: PC is the city, U is unincorporated county.
Callsville, citrus and the crossroads on State Road 39
Hopewell lies along State Road 39 just south of State Road 60, and it may reach a little north of the highway. Before it took the Hopewell name it was Callsville, with a post office in 1883 and 1884. The Hopewell Baptist Church was founded in 1870 and named for the McDonald family's former home in Alabama. The county's historic resources survey tells the land story: in the 1890s the Warnell Lumber and Veneer Company built a logging railroad through and cleared the timber, farmers planted citrus on the cleared acres, and by 1927 several packing plants were running. Families also grew strawberries, corn and potatoes and raised cattle.
The 1998 survey described Hopewell as dominated by orange groves, abandoned phosphate mines, and the church and its cemetery. That mix is why ground prep leads this page. For the wider map, see where we pour around Plant City.

Old phosphate pits and cleared grove ground under a Hopewell slab
Coronet Phosphate Company was making inroads here by 1916, moved its mining to the lands around Hopewell in the mid-1920s and kept mining through the 1940s. FDOT's geotechnical memo for the SR 60 corridor says the sandy soils along that road support pavement once the subgrade is prepared, and it names organic and mining-related soils as the main exceptions that have to be dealt with first. The same memo notes that some old mine pits were backfilled with waste phosphatic clay, known as slime, which it describes as generally too weak to support a roadway. A slab is no different.
Grove ground has its own catch. If grove trees were pushed over and buried, those roots and stumps are vegetation, and Florida's residential code wants fill under a slab free of vegetation and compacted for uniform support. So on a Hopewell lot we dig test spots where the slab will sit before anything is formed. Clean, firm sand gets compacted and we move on. Dark, spongy or mixed fill comes out and clean sand goes back in lifts, and the code caps clean sand fill at 24 inches unless approved. If a seller or neighbor ever told you the lot was mined, dug or filled, tell us before the visit. The sandy soil guide covers the rest of the ground story.

Concrete Pricing
Our ranges for Hopewell properties, before the test holes tell us what's underneath.
| Job | Per sq ft | Typical project | What moves the price |
|---|---|---|---|
| Concrete driveway | $8 to $14 | $5,000 to $10,000 | Typical 2-car at 4 to 5 in.; lane length from SR 39; tear-out adds $2 to $4 per sq ft |
| Concrete patio | $8 to $14 | $2,500 to $6,500 | About 250 to 450 sq ft; fall away from the house |
| Sidewalk or walkway | $8 to $14 | $1,500 to $4,500 | 4 in., 3 to 5 ft wide; short runs hit a job minimum |
| Stamped and decorative | $14 to $24 | $5,000 to $16,000 | Pattern, color and sealer |
| Shop, barn or feed pad | $7 to $12 | $2,000 to $7,500 | 4 in. reinforced; soft or mined ground replaced; thicker or monolithic costs more |
Removing soft or mined fill and a state or county road connection can raise the total. Free written estimate after we see the site.
State Road 39, State Road 60 or a county road: who owns your driveway edge
Hopewell sits on two state highways, and that changes the paperwork. A driveway that connects to State Road 39 or State Road 60 connects to the State Highway System, and Florida Statutes 335.182 puts those connections under FDOT. A driveway off a county road takes Hillsborough County's right-of-way permit, which carries a $50 base fee and applies only on unincorporated land.
Before either, confirm the parcel. Hopewell's mapped center falls outside Plant City limits, but edges vary. Plant City's permit FAQ says to read the Tax District on the Hillsborough County Property Appraiser record: PC is the city, U is the county. If it turns out to be a city parcel, the apron in the right-of-way must be 3000 psi fiber concrete at least 6 inches thick with no steel, and the city inspects the forms before the pour. Our permit guide lays out each office step by step. Tell us which road your lane meets and we'll price the apron to that office's rules.

What to Expect, Start to Finish
Test holes
We dig where the slab will sit and look at what comes up before we price the base.
Road and parcel check
We confirm the Tax District and whether FDOT, the county or the city covers the driveway connection.
Written quote
Base repair, thickness, steel and finish, each priced on its own line, within 48 hours.
Rebuild the base
Soft fill comes out, clean sand goes in by lifts, and we grade in the fall.
Pour and cure
We pour, finish, start curing right away and leave the lot clean.
Shedding rain off a Hopewell grove lot
FDOT's memo puts the water table at or near the surface across much of Hillsborough County, so a slab that's level with the yard can turn into a puddle in the wet months. We set every Hopewell pour with fall built in: a driveway slopes so runoff heads toward the road or a swale and never back at the house, a patio slopes away from the back door, and a pad for a shop or barn sits a little proud of the grade around it.
Cattle and feed pads need the same thinking, plus a rough finish so hooves and boots don't slip when it's wet. A pad that gets washed down should drain to one edge, not toward a building. Our concrete slabs run $7 to $12 per sq ft, or $2,000 to $7,500 for a typical 4-inch reinforced pad, with thicker or monolithic work priced higher. A 20 by 24 feed pad is 480 sq ft, close to $3,360 at the low rate. Walk the lot after a hard rain before we visit and note where water stands.
Hopewell price ranges, and two jobs on one trip
Our concrete driveways run $8 to $14 per sq ft, and a typical two-car driveway of 500 to 700 sq ft lands at $5,000 to $10,000. A grove-house lane from State Road 39 is longer, so the total follows the square footage. Tear-out of an old surface adds $2 to $4 per sq ft. A patio runs $2,500 to $6,500 and a walk $1,500 to $4,500. Stamped concrete runs $14 to $24 per sq ft because pattern, color and sealer are built in. Pool decks can be quoted on the same visit.
If you need a driveway and a shop slab, ask for both at once. One test-hole visit covers the whole lot, one permit conversation covers the road, and the base work can be done in one pass. Hopewell's neighbors are close by: Trapnell to the north, Bealsville, which freed people from Hopewell helped settle in late 1865, Springhead, Coronet, where the mining company started, and Walden Lake inside the city.
Frequently Asked Questions
Can you pour concrete on a Hopewell lot that was once phosphate mined?
What happens if you hit a soft spot while prepping my Hopewell pad?
We cleared old orange trees from our Hopewell lot. Can stumps cause trouble under concrete?
Can you pour a cattle or feed pad on a Hopewell property?
Where should rain go off a new slab on a Hopewell lot?
Can I get a driveway and a shop slab poured on the same Hopewell visit?
Sources
- Hillsborough County Historic Resources Survey: Hopewell, Hillsborough County (via Hillsborough Water Atlas, USF)
- Hopewell, Hillsborough County, FL, HomeTownLocator
- SR 60 PD&E Study Geotechnical Memorandum (April 2015), Florida Department of Transportation District Seven
- Florida Residential Code 2023, Chapter 5 Floors, UpCodes (Florida Building Code)
- Florida Statutes 335.182, Regulation of connections to roads on State Highway System, Florida Legislature
- Apply for a Right-of-Way (ROW) Management Permit, Hillsborough County
- Information Search FAQs, City of Plant City
- Hillsborough County Historic Resources Survey: Bealsville, Hillsborough County (via Hillsborough Water Atlas, USF)
- TIGERweb 2020 Census: incorporated places point query at Hopewell, U.S. Census Bureau
Request Your Free Estimate
Tell us a little about the job in Hopewell. We'll call to set a time to come measure.
Thank you, we have it.
We'll call shortly to set a time to measure. Prefer to talk now? Call (813) 722-1744.
Concrete Services in Hopewell
Concrete Driveways
New driveways, extensions, and full tear-out replacements poured thick enough for Florida trucks and built to drain.
Learn MoreConcrete Patios
Backyard patios, lanai extensions, and screen-room slabs sized for real outdoor living in the Florida heat.
Learn MoreConcrete Sidewalks & Walkways
Front walks, side-yard paths, and city-spec sidewalks with proper joints so they don't crack and heave.
Learn MoreStamped & Decorative Concrete
Stamped and colored concrete for patios, driveways, and entries. The look of stone or pavers in one solid pour.
Learn MoreConcrete Slabs & Foundations
Slabs for sheds, workshops, garages, barns, and additions. Formed square, compacted right, ready to build on.
Learn MoreOur Service Areas
Concrete work across Plant City and its neighborhoods.
Page updated