Concrete Driveways in Lincoln Park, Plant City
New, wider or replacement concrete driveways on the old Lincoln Park plats. You get a written quote within 48 hours.
Straight Answers,
Written Quotes
Quick answer
Plant City Concrete Co pours concrete driveways in Lincoln Park, Plant City, whether it's a tear-out on South Merrin Street or the first slab on an empty lot. The part on your land runs 4 to 5 inches with a broom finish at $8 to $14 per sq ft. A typical two-car concrete driveway job lands between $5,000 and $10,000.
Three kinds of driveway jobs on the Lincoln Park plats
Lincoln Park homes went up in every decade from the 1900s to the 2020s, and the 2026 tax roll puts the median year near 1975. You can see that spread in the driveway work. One house has a narrow strip that's been patched for decades. The next has a settled, cracked slab that's ready for a full tear-out. And 69 parcels on the roll are still vacant residential lots, so a brand-new concrete driveway on bare sand is a real job here too.
Every one of those jobs starts at the curb or road edge, on streets like South Warnell, Jenkins, Allen or East Renfroe. The City of Plant City decides what you can pour there, because the whole neighborhood, about 91 acres, sits inside city limits. A lot out in unincorporated Turkey Creek permits with Hillsborough County instead, which is a different office. Our Lincoln Park neighborhood page covers the ground and the history. This page stays on the driveway.

What Ona sand means for a slab that carries a car
The county soil layer maps about 86% of Lincoln Park as Ona fine sand. It's rated poorly drained, and its seasonal water table can come up to about 31 cm from the surface. The survey calls it "very limited" for houses but only "somewhat limited" for local roads and streets, which is the closer match for a driveway. Seffner fine sand covers about a tenth of the area and drains somewhat poorly. Whichever one you've got, the sod and roots can come out, the sand can be compacted in lifts, and the finished surface gets shaped so water runs toward the street, which the City requires anyway.
Then you pick a thickness. Concrete Network puts the minimum for a home driveway at 4 inches. Going from 4 to 5 inches, it says, adds roughly 20% to the concrete cost and raises load capacity by nearly half. Park a work truck or a camper on it and that extra inch pays for itself. Fiber holds down shrinkage cracks, but NRMCA says it doesn't stand in for steel or let you pour a thinner slab. Our guide to building on sandy ground walks through the base work.

Concrete Pricing
Here are our ranges for Lincoln Park driveway work. The free written estimate is what you sign, not this table.
| Job | Per sq ft | Typical project | What moves the price |
|---|---|---|---|
| New concrete driveway on a vacant lot | $8 to $14 | $5,000 to $10,000 | Distance from house to street, culvert, apron |
| Tear-out and replacement | $8 to $14 plus $2 to $4 tear-out | $5,000 to $10,000 plus tear-out | Old slab thickness, haul-off, apron rebuild |
| Driveway extension or widening | $8 to $14 | Priced from the visit | Meter box or cleanout in the path, grade |
| Stamped border or fully stamped driveway | $14 to $24 | $5,000 to $16,000 | Pattern, color, sealer |
These ranges assume a 4 to 5 inch broom finish on a two-car layout of about 500 to 700 sq ft. The apron, a culvert and any fill each get their own line. You get a free written estimate after we see the site.
The City's apron spec, from the wood joint to the road edge
The strip between your property line and the street is right-of-way, and the City has its own rules for it. The City of Plant City FAQ says that part has to be 3000 psi concrete with fiber, at least 6 inches thick, with no rebar and no mesh. That makes a Lincoln Park driveway two pours in one a lot of the time: a 4 to 5 inch slab on your lot and a thicker, steel-free apron out front.
The joints change out there too. The City wants full-depth, pressure-treated wood joints at the right-of-way line, along the road and along any sidewalk. No saw cuts. Where the apron meets asphalt, the asphalt gets saw-cut straight at that wood joint. Want pavers in the right-of-way? Engineering has to sign off.
Got a roadside ditch? The culvert under the driveway must be at least 15-inch concrete pipe with mitered end sections. The forms get inspected before any apron is poured, and that inspection needs 24 hours' notice. Once it's poured, the apron is yours to maintain. City repairs stop at the edge of the pavement.

What to Expect, Start to Finish
Send the street and a photo
Snap a picture of the old slab and the road edge. It tells us a lot before we come out.
Walk the lot together
We measure, check how the lot falls toward the street, and look for meter boxes, cleanouts and any ditch.
Quote in writing in 48 hours
Tear-out, base, the slab on your lot and the right-of-way apron each get their own line.
Permit, form check, pour
We pull the City permit first. The apron forms get inspected with 24 hours' notice, then we pour and clean up.
Meter boxes, cleanouts and slope on an older Lincoln Park lot
Widening an old Lincoln Park driveway can mean pouring over ground that's been yard for fifty years. The City's rule here is plain: no sewer laterals, cleanouts, water service lines or meter boxes in or under the slab. If one sits where the wider driveway will go, it has to be handled before the forms go in. That's why we look for them at the free site visit and can note each one on the written quote.
Slope is the other rule. Every driveway has to fall toward the road. An "inverted" one that sends runoff back at the house isn't allowed. If your house sits low against the street, that can mean bringing in fill, and fill or rerouted water can need a sign-off from the City's Streets and Stormwater staff.
On the lot itself, control joints go no more than 10 feet apart on a 4 inch slab, cut a quarter of the slab's depth. Isolation joints go wherever the new slab meets the garage floor, a front walk or older paving. Breaking out a cracked slab first adds $2 to $4 per sq ft.
Permit, lien notice and the $7,500 question in Lincoln Park
Plant City lists driveways among the jobs that need a permit, and you need that permit in hand before work starts. The site plan shows the driveway plus any walks and setbacks. Our Plant City driveway permit walkthrough takes you through the packet step by step.
Next comes the lien paperwork. Under Florida law (F.S. 713.13 with 713.02(5)), improvements over $2,500 need a Notice of Commencement recorded with the County Clerk before work begins. Once the contract tops $5,000, a copy also goes to the building department before the first inspection. A driveway contract above $5,000 clears both lines, and our two-car range starts at $5,000.
Maybe you've heard HB 803 lets small jobs skip the permit. It covers qualifying non-structural work under $7,500 on single-family residential property, and only with written approval first. Hillsborough County's own exemption page adds that it doesn't apply if any part of the property is in a flood hazard area. About 7% of the Lincoln Park plats fall in FEMA Zone AE on panel 12057C0288H, so look up your parcel before you count on it.
Pour week in rainy season, and the first time you park
The National Weather Service puts the local rainy season at May 25 to October 10. The strongest storms come in late May and June, and the heaviest rain runs from July into early September. Pour a driveway in those months and we can schedule an early start. If the Ona sand base is soaked, the date can slide.
Heat matters as much as rain. NRMCA's hot weather guidance says to skip the hottest part of the day when you can, dampen the subgrade without leaving puddles, never add extra water at the truck, and start curing as soon as finishing wraps up, for at least 3 days.
After that, you wait. IRMCA says to keep cars off new concrete for at least 7 days, seal it about 30 days after the pour, and reseal every 2 years. When the forms come off, we leave the site clean. Want to see how the total adds up? Check our Plant City driveway cost breakdown.
Frequently Asked Questions
How thick should a driveway be on the wet sand under Lincoln Park?
Do I need a City permit to replace my driveway on South Merrin Street?
My Lincoln Park lot never had a driveway. What comes first?
Can the slab on my lot have mesh if the Lincoln Park apron can't?
Could HB 803 let me skip the permit for a Lincoln Park driveway?
How many days before I park on a new driveway in Lincoln Park?
Sources
- Information Search FAQs, City of Plant City
- Soils_NRCS (SSURGO FL057), USDA-NRCS via Hillsborough County GIS
- National Flood Hazard Layer: Flood Hazard Zones, FEMA
- Florida Statewide Cadastral (2026 roll), Florida Department of Revenue parcel data
- Work Exempt from Permits, Hillsborough County Development Services
- Concrete Driveway Installation: 8 Essentials, Concrete Network
- Driveways (homeowner technical resource), Illinois Ready Mixed Concrete Association
- CIP 12: Hot Weather Concreting, NRMCA
- Florida Statutes 713.13: Notice of commencement, Florida Legislature (Online Sunshine)
- Florida Statutes 713.02: Types of lienors and amounts of liens, Florida Legislature (Online Sunshine)
Request Your Free Estimate
Tell us a little about the job. We'll call to set a time to come measure.
Thank you, we have it.
We'll call shortly to set a time to measure. Prefer to talk now? Call (813) 722-1744.
Other Concrete Services
Concrete Driveways
New driveways, extensions, and full tear-out replacements poured thick enough for Florida trucks and built to drain.
Learn MoreConcrete Patios
Backyard patios, lanai extensions, and screen-room slabs sized for real outdoor living in the Florida heat.
Learn MoreConcrete Sidewalks & Walkways
Front walks, side-yard paths, and city-spec sidewalks with proper joints so they don't crack and heave.
Learn MoreStamped & Decorative Concrete
Stamped and colored concrete for patios, driveways, and entries. The look of stone or pavers in one solid pour.
Learn MoreConcrete Slabs & Foundations
Slabs for sheds, workshops, garages, barns, and additions. Formed square, compacted right, ready to build on.
Learn MoreOur Service Areas
Concrete work across Plant City and its neighborhoods.
Page updated